What Is IEC 61850?

IEC 61850 is the international standard for communication in electrical substations and other power utility automation. It gives every protection relay, meter and controller a common data model, a configuration language (SCL) and three Ethernet services: MMS for SCADA, GOOSE for fast peer-to-peer trips and Sampled Values for digitised measurements.

01

How IEC 61850 works

IEC 61850 is the international standard for communication networks and systems in power utility automation, written by IEC Technical Committee 57. It was first published in parts between 2003 and 2005 for substations and has since been extended to hydro plants, wind farms and distributed energy resources. Unlike older telecontrol protocols, it is a whole framework: a data model, a set of communication services, a configuration language and test rules.

The devices it connects are intelligent electronic devices (IEDs): protection relays, bay controllers, meters, merging devices and gateways. Before IEC 61850, a substation joined them with hundreds of hard-wired copper signals and a different vendor protocol at each level. IEC 61850 replaces much of that wiring with Ethernet, and replaces vendor point lists with names that describe what each value is.

Each IED is modelled as logical devices that contain logical nodes, standard functions with four-letter names. XCBR is a circuit breaker, MMXU a measurement, PTOC overcurrent protection and CSWI a switch controller. A value such as phase A voltage becomes a readable path like MMXU1.PhV.phsA, so a client from another vendor knows what it is reading without a register map.

02

Three services: MMS, GOOSE and Sampled Values

The standard defines its services in the abstract, then maps them onto real protocols. Three mappings carry almost all substation traffic, and each has a different job and timing class.

Service Part Model Carried over Typical use Timing
MMS IEC 61850-8-1 Client/server TCP/IP, port 102 SCADA and gateway reads, reports, controls, settings and files Hundreds of milliseconds to seconds
GOOSE IEC 61850-8-1 Publisher/subscriber Layer 2 multicast, EtherType 0x88B8 Trips, interlocks and breaker status between IEDs Around 3 ms for trip messages
Sampled Values IEC 61850-9-2 Publisher/subscriber Layer 2 multicast, EtherType 0x88BA Digitised current and voltage on the process bus Typically 80 samples per power cycle
Time sync IEC 61850-9-3 / SNTP Grandmaster to clocks PTP power utility profile, or SNTP Event time stamps and sample alignment Around 1 µs with PTP

MMS is the slower, routable client/server service a SCADA master or gateway uses to read values, receive reports and send controls. GOOSE and Sampled Values skip TCP/IP and run directly on Ethernet frames, usually in their own VLAN with IEEE 802.1Q priority tags, because a trip signal cannot wait behind file transfers. GOOSE repeats each message at short, then lengthening, intervals so a subscriber can detect a lost publisher.

03

Station bus and process bus

IEC 61850 describes a substation in three levels: the station level with the SCADA and gateway, the bay level with protection and control IEDs, and the process level with the switchgear and instrument transformers.

  • //
    Station bus. The network between the bay IEDs and the station computers. It carries MMS reports and controls, plus GOOSE between bays for interlocking and breaker-failure schemes.
  • //
    Process bus. The network between the bays and the switchyard. Sampled Values replace the copper secondary wiring from current and voltage transformers, and GOOSE carries breaker status and trip commands.
  • //
    Gateway to the control centre. Most utilities still talk to their control centre over DNP3 or IEC 60870-5-104, so a substation gateway translates between IEC 61850 inside and the telecontrol protocol outside.
04

SCL configuration files

The Substation Configuration Language (SCL), defined in IEC 61850-6, is an XML format that describes devices, their data models and the communication between them. Engineering tools from different vendors exchange the same files, which is what makes multi-vendor substations practical.

  • //
    ICD (IED Capability Description). Supplied by the device vendor: everything a type of IED can do.
  • //
    SSD (System Specification Description). The single-line diagram and the functions the substation needs.
  • //
    SCD (Substation Configuration Description). The full design: every IED, its data sets, GOOSE and Sampled Values subscriptions and network addresses.
  • //
    CID (Configured IED Description). The part of the SCD loaded into one device.
FAQ · 01
What is feeder automation?
Feeder automation uses sensors, reclosers and switches on distribution feeders, controlled locally or from a control centre, to detect faults, isolate the damaged section and restore supply to the rest. It often reports to SCADA over DNP3 or IEC 60870-5-104, with IEC 61850 increasingly used between devices.
Read the full FAQ —
05

Hardware for IEC 61850 networks

Substation networks sit close to high-voltage switchgear, so the equipment on them has its own environmental standard. IEC 61850-3 sets the general requirements for communication equipment in substations: electromagnetic immunity to switching surges and fast transients, insulation, wide temperature and power supply ranges. In North America IEEE 1613 covers similar ground.

Availability matters as much as speed. A spanning tree reconvergence is too slow for protection traffic, so process bus and critical station bus links often use PRP or HSR from IEC 62439-3, which send every frame over two paths for zero recovery time. Many station buses use a ring of managed industrial switches instead; several Antaira switches in our range list IEC 61850-3 Edition 2.0 for substations alongside ERPS ring recovery and VLANs. For station computers, a fanless rack mount server in our range lists IEC 61850-3 in its certifications.

Security is covered by IEC 62351, which adds TLS for MMS and message authentication for GOOSE and Sampled Values. The substation gateway is usually also where the network boundary to the wider SCADA system is enforced.

06

Where IEC 61850 is used

Transmission substations adopted IEC 61850 first, and many new high-voltage substations in the UK and Europe are now specified with it. Distribution networks are following as they automate, connecting reclosers, ring main switches and an RTU or gateway in secondary substations. Hydro plants use IEC 61850-7-410, solar, battery storage and other distributed energy resources use IEC 61850-7-420, and wind farms use the related IEC 61400-25 series. Our power and energy page covers the computers and networks we supply to these sites.

07

Quick answers on IEC 61850

IEC 61850: common questions

Is IEC 61850 a protocol?

More than one. IEC 61850 is a series of standards. It defines a data model and abstract services, then maps them onto real protocols: MMS over TCP/IP, and GOOSE and Sampled Values directly on Ethernet. People often say “the IEC 61850 protocol” when they mean MMS.

What is GOOSE in IEC 61850?

Generic Object Oriented Substation Event. It is a multicast Ethernet message that one IED publishes and others subscribe to, used for trips, interlocks and status. It is retransmitted continuously, so subscribers know within milliseconds if the publisher or the network fails.

What is the difference between IEC 61850 and DNP3?

Scope and data model. DNP3 is a telecontrol protocol that moves numbered points between a master and outstations, usually from substation to control centre. IEC 61850 models the whole substation with self-describing names and adds fast peer-to-peer messaging. Many substations use IEC 61850 inside and DNP3 to the control centre.

How does IEC 61850 compare with IEC 60870-5-104?

They work at different levels. IEC 60870-5-104 is the European counterpart of DNP3 for links to the control centre, using numbered information objects over TCP port 2404. IEC 61850 covers communication inside the substation, and gateways translate between the two.

What is IEC 61850-3?

The hardware part. IEC 61850-3 sets general environmental, EMC and safety requirements for communication equipment such as switches and computers installed in substations. It says nothing about protocols, so a device can meet IEC 61850-3 without running IEC 61850 services.

We supply the managed switches and industrial computers for substation and grid-edge projects with their network, operating system and protocol software configured as standard. Send us your bay count, redundancy scheme and environmental limits, and we will specify the hardware to match.