How ECDIS works
ECDIS is a computer-based navigation system that displays official electronic navigational charts (ENCs) together with live data from the ship’s sensors. It is used to plan a passage, then to monitor the ship along that route, and it watches for hazards that a navigator reading a paper chart would have to spot by eye.
An ECDIS has four parts. The chart data is a vector ENC issued by, or on behalf of, a national hydrographic office, which the system converts into its own working format, the system ENC or SENC. The sensors supply position from GNSS, heading from the gyro compass and speed through the water from the log; radar and AIS targets can be overlaid on top. The software handles route planning, route monitoring, chart updates and alarms. The hardware is a computer and a calibrated display, both tested for the bridge environment.
Because the chart is vector data, not a scanned picture, the system knows where the shallow water is. The navigator sets a safety contour and safety depth for the ship’s draught, and the ECDIS raises an alarm if the planned route or the ship’s predicted track crosses it. That anti-grounding check is the main reason ECDIS was made compulsory.
ECDIS vs ECS and paper charts
Many chart plotters look like an ECDIS, but only a system that meets the IMO performance standard, has been type approved and uses official charts can count towards the chart carriage rules. The International Maritime Organization calls everything else an electronic chart system, or ECS.
| Feature | ECDIS | ECS | Paper charts |
|---|---|---|---|
| Meets SOLAS chart carriage | Yes, with an approved back-up | No, an aid to navigation only | Yes, when official and corrected |
| Type approval | Tested to IEC 61174 | None required | Not applicable |
| Chart data | Official ENCs; raster charts only in RCDS mode | Any vector or raster charts, official or not | Official paper charts |
| Updates | Electronic updates applied to the SENC | Depends on the supplier | Hand corrections from Notices to Mariners |
| Alarms | Safety contour, anti-grounding, off-track and more | Varies, often limited | None |
| Typical users | SOLAS ships, ferries, tankers, cargo ships | Fishing vessels, workboats, yachts | Back-up and smaller vessels |
Where no ENC exists for an area, an ECDIS can run in raster chart display system (RCDS) mode with official raster charts. Its alarms then have no depth data to work from, so an appropriate folio of up-to-date paper charts is normally required alongside it.
Who has to carry ECDIS
SOLAS chapter V, regulation 19, made ECDIS compulsory on most ships engaged on international voyages. Carriage was phased in between 2012 and 2018, starting with new passenger ships of 500 gross tonnage and upwards and new tankers of 3,000 gross tonnage and upwards, then working through cargo ships and existing vessels by size. High-speed craft were brought in earlier. Smaller vessels, fishing boats and pleasure craft outside these rules usually run an ECS instead.
Carrying ECDIS also brings two duties for the operator. The first is a back-up arrangement, so that a single failure does not leave the bridge without charts: in practice either a second, independent ECDIS on a separate power supply or a folio of corrected paper charts. The second is training. The STCW Convention requires generic ECDIS training for deck officers, and under the ISM Code the company must also give type-specific familiarisation on the make and model fitted to each ship.
The standards behind ECDIS
No single document defines ECDIS. Several bodies each own a piece of it.
-
//
IMO performance standard. Resolution MSC.232(82) sets what an ECDIS must do, from chart display and route checking to alarms and back-up. Amendments add the requirements for S-100 charts.
-
//
IEC 61174. Turns the IMO standard into test methods and required results, and is the basis of type approval.
-
//
IEC 62288 and IEC 60945. IEC 62288 covers how navigation information is presented on bridge displays; IEC 60945 sets the environmental and EMC tests for the hardware.
-
//
IHO S-52, S-57 and S-63. The International Hydrographic Organization sets the chart symbols and day, dusk and night colour palettes (S-52), the ENC data format (S-57) and chart data encryption (S-63).
-
//
IHO S-100 and S-101. The next generation of hydrographic data. IMO’s revised performance standard lets S-100 ECDIS be fitted from 2026, with new installations expected to follow it from 2029, so check which edition a project is built to.
ECDIS displays and computers
The hardware matters because the IMO standard sets requirements the screen itself must meet. The chart area used for route monitoring must be at least 270 × 270 mm, which in practice puts most ECDIS screens at around 19 inch and above. Colours must match the S-52 palettes, so displays are calibrated at the factory, and the night palette has to dim far enough to keep the officer of the watch’s night vision. A dimming knob or keys for day, dusk and night modes are common for that reason.
An ECDIS is approved as a complete system, so a display or computer is not type approved for ECDIS on its own. The ECDIS manufacturer specifies and tests the hardware that runs its software, and the hardware is built to pass IEC 60945, including its strict radiated emission limits around the marine VHF band. Our guide to IEC 60945 and maritime computing requirements explains how those tests and DNV type approval fit together.
Our marine monitors include ECDIS versions in several sizes with PCAP touch and day, dusk and night mode keys, and most of the range lists DNV-CG-0339 among its approvals. For planning stations and other bridge computing, our marine panel PCs combine the screen and computer in one panel-mount housing.
Quick answers on ECDIS
ECDIS: common questions
What does ECDIS stand for?
Electronic Chart Display and Information System. The name comes from the IMO performance standard, which defines what such a system must do to replace paper charts.
Is ECDIS mandatory?
On most SOLAS ships, yes. Passenger ships, tankers and larger cargo ships on international voyages have had to carry it since the 2012–2018 phase-in. Smaller and non-SOLAS vessels usually do not.
Which sensors must connect to ECDIS?
Position, heading and speed. GNSS, the gyro compass and the speed log are the mandatory inputs. Radar, AIS and echo sounder data are commonly added.
What is RCDS mode?
A fallback using raster charts. Where no ENC covers an area, ECDIS can show official raster charts, but without depth-based alarms, so paper charts are normally carried as well.
What ECDIS training do officers need?
Generic and type-specific. STCW requires a generic ECDIS course, often based on IMO model course 1.27, and the ship operator adds familiarisation on the model fitted.
We supply marine monitors and computers for bridge consoles as part of a complete system, with the mounting, power input and dimming matched to the console as standard.