What ISO 7637-2 tests
ISO 7637-2 is part 2 of the ISO 7637 series, “Road vehicles: electrical disturbances from conduction and coupling”. It sets bench tests for the short, high-voltage spikes that travel along a vehicle’s 12 V or 24 V supply wiring whenever loads are switched, and it applies to passenger cars and commercial vehicles whatever drives them, from diesel engines to electric motors.
The standard has two halves. The emissions test measures the transients a device itself creates on its supply line, for example when it switches a relay or motor. The device is connected through an artificial network, which gives the wiring a standard impedance so results from different laboratories can be compared. The immunity test does the opposite: a transient generator injects standard test pulses into the device’s supply input while it runs, and the device’s behavior is recorded.
Tests are run at 23 ± 5 °C with the supply held at 13.5 V for a 12 V system or 27 V for a 24 V system. The current third edition was published in 2011, replacing the 2004 edition and its 2008 amendment.
The ISO 7637 family
Part 2 is the best known, but it is one of several parts that share definitions and test methods.
-
//
ISO 7637-1. Definitions and general considerations used by the other parts.
-
//
ISO 7637-2. Conducted transients on supply lines only, covered on this page.
-
//
ISO 7637-3. Transients coupled capacitively or inductively onto other lines, such as sensor and data cables, using coupling clamps.
-
//
ISO 7637-4. Transients on shielded high-voltage supply lines, for the traction systems of electric and hybrid vehicles.
-
//
ISO/TR 7637-5. A technical report with enhanced definitions and verification methods for the test pulses.
What the standard fixes and what the vehicle maker decides
ISO 7637-2 defines how to test, not exactly what every device must survive. The standard itself says some pulses may be left out if a device is not exposed to them, and that choosing the required pulses is the vehicle manufacturer’s job. Many manufacturer standards also modify the waveforms. The table shows the split.
| Element | Set by ISO 7637-2 | Decided by the vehicle maker or specification |
|---|---|---|
| Supply during test | 13.5 V or 27 V, unless agreed otherwise | Any agreed variation, recorded in the report |
| Emissions test | Artificial network, switch and measurement method | Which devices are tested and the emission limits |
| Immunity pulses | Waveforms for pulses 1, 2a, 2b, 3a and 3b | Which pulses apply to a given device |
| Severity levels | Example levels in informative Annex A | The level and number of pulses actually applied |
| Pass criteria | A function performance status classification | The status each function must achieve |
| Generator | Pulse generator specification and verification | Laboratory choice, within the specification |
So “ISO 7637-2 compliant” on a datasheet tells you the input was tested with these pulses, but not at which level or to which status. For a vehicle approval, ask for the test report.
Test levels and pass criteria
The example severity levels in Annex A increase with the system voltage, so 24 V trucks and buses are tested harder than 12 V cars. The fast switching pulses, 3a and 3b, reach a few hundred volts but last well under a microsecond, while pulse 2b is low in voltage but lasts up to a couple of seconds, so it tests a different weakness in the input stage.
Each result is judged against a function performance status. In plain terms, the classification asks whether the device kept working normally through the pulses, recovered by itself afterwards, or needed a reset or power cycle to recover. A navigation display that briefly flickers may be acceptable; a telematics computer that locks up until someone switches it off and on again usually is not.
Load dump, the large surge when a battery is disconnected while the alternator is charging, is no longer part of ISO 7637-2. Pulses 4, 5a and 5b moved to ISO 16750-2 in the 2011 edition, so a vehicle specification normally calls on both standards.
What is load dump?
Load dump is the surge on a vehicle supply when the battery is suddenly disconnected while the alternator is charging hard. The battery normally absorbs the alternator’s output, so when it drops off the circuit, through a corroded terminal, a loose cable or a battery isolator opened with the engine running, the alternator’s field takes a fraction of a second to collapse and its voltage rises steeply. Every device still connected sees the surge, which can last a few hundred milliseconds and carries far more energy than the switching pulses above.
The load dump tests left ISO 7637-2 in the 2011 edition and now sit in ISO 16750-2, the standard for electrical loads on vehicle equipment. They come in two forms, and a datasheet that just says “load dump protection” may mean either.
-
//
Test A, unsuppressed. For alternators without central surge protection. In the 2010 edition of ISO 16750-2 the peak is set somewhere around 79 to 101 V for 12 V systems and 151 to 202 V for 24 V systems, lasting tens to hundreds of milliseconds.
-
//
Test B, suppressed. For alternators with built-in clamping diodes, now common. The device sees a clamped surge, typically around 35 V on a 12 V system and 58 V on a 24 V system, unless the vehicle maker specifies otherwise.
-
//
Pulses 5a and 5b. The names the same two cases had in ISO 7637-2:2004. Many datasheets still use them.
How vehicle computers handle load dump
Because the energy is large, a small transient suppressor that copes with pulses 1 to 3 may not survive an unsuppressed load dump. Vehicle power inputs usually combine a transient voltage suppressor sized for the energy, a surge stopper or pre-regulator that limits what reaches the converter, and a component rating above the clamped level. On 24 V heavy vehicles, where the surge is larger and battery isolators are common on tankers and plant, it is worth asking which test and level a datasheet means.
Where the vehicle supply is especially harsh, an isolated DC-DC converter in front of the computer adds a further barrier; our industrial power supplies include rugged DC-DC designs tested to MIL-STD-1275 for 28 V military vehicles.
ISO 7637-2, E-mark and vehicle computers
UN ECE Regulation 10, the basis of the E-mark for electronic sub-assemblies, calls on ISO 7637-2 for its conducted transient tests. Our guide to E-mark certification and UN ECE R10 explains how the approval works and what each pulse simulates. Military vehicles use a different standard for the same job, MIL-STD-1275, which covers 28 V vehicle power.
A computer designed for vehicle power usually handles these pulses in its input stage: a transient voltage suppressor or similar clamp, filtering, a wide-range DC input and enough hold-up to ride through short dips. Several of our in-vehicle computers list ISO 7637-2 pulse protection on their 12 or 24 V DC input together with smart ignition control. Proving a full design still means EMC testing at an accredited laboratory.
Quick answers on ISO 7637-2
ISO 7637-2: common questions
What is the difference between ISO 7637-2 and ISO 16750-2?
Fast transients versus supply conditions. ISO 7637-2 covers short switching transients. ISO 16750-2 covers the wider electrical environment, including voltage ranges, reverse polarity, starting profiles and load dump.
Does ISO 7637-2 include load dump?
Not since 2011. Load dump pulses 5a and 5b now sit in ISO 16750-2, together with the old pulse 4 for engine cranking.
What is ISO 7637-3?
The signal-line part. It tests transients coupled onto lines other than the supply, such as sensor and data cables, using capacitive and inductive coupling clamps.
What is an ISO 7637 transient generator?
The test instrument. It produces the standard pulse waveforms at set voltages and source impedances, and the standard describes how to verify its output before testing.
Is ISO 7637-2 mandatory?
Not on its own. It becomes a requirement through UN ECE R10 for E-mark approval and through vehicle manufacturer specifications.
We supply in-vehicle computers as part of a complete system, with the power input, ignition settings and mounting matched to the vehicle as standard.